The battery backup capacity at the QTH in ABQ has been increased to a calculated runtime of five days. This includes discharge to 50% and is the raw capacity not including the solar recharging that could also be employed during an outage.
A full scale runtime test will be scheduled at a later date to determine actual runtime until generator power is needed to boost battery charge without solar assist.